Strict quality control has been applied on every stage from incoming materials, manufacturing process, finished molds to delivery.
QC: 7 people
ü 1 supervisor, has been 9 years workedd in the factorry, 7 years in mold assembling line, and 2 years in QC dept.
ü 3 worked in QC room, for electrode inspection, steel inspection, sample inspection, electrodes inspection
ü 3 worked on-site for steel receiving hardness checking, block machining checking, mold fitting checking before tryout.
Main QC Procedure:
ü Mould Design Control
ü Mould Steel Hardness Inspection
ü Mould Electrodes Inspection
ü Mould Core and Cavity Steel Dimension Inspection
ü Mould Pre-Assembly Inspection
ü Mould Test Report and Samples Inspection
ü Mould Pre-Shipment Final Inspection
ü Export Mould Package Inspection
Main QC Equipments:
ü CMM Machine
ü Optical Projector
ü Height Gauge